Projects

Sakunda Energy

Sakunda Energy

Sakunda Energy is a leading fuel supplier in Zimbabwe that is expanding. They know the importance of branding and advertising, and so approached First African Holdings to design, manufacture and install industrial signage at their various sites around the country. 

Metriplex Media Cladding

Metriplex Media Cladding

Metriplex Media is a local media company specialising in retail advertising via LED screens. They approached us last year to provide a cladding solution to go with their own signs.

A high rise pylon sign for Sonangol at First African Holdings signage manufacturing facility, ready for installation.

Sonangol (Angola)

The Angolan national oil company is rapidly rolling out new fuel stations across its war ravaged territory with First African Holdings supplying the contractor appointed by Sonangol to refurbish the organisation’s filling stations.

Chevron Global Lubricants Workshop

Chevron Global Lubricants provides advanced products for industrial, commercial and consumer applications and is a leader in finished lubricants and the leading global producer of premium base oil.

Chevron is currently embarking on a new roll out for Chevron's Lubricant Brands.  It is called Chevron Global Lubricants Workshop and are divided into three Workshop types:

Cape Town International Airport Digital Screen

Cape Town International Airport

A project at the Cape Town International Airport provided us with some unique challenges, which turned out surprisingly well to our advantage. Kwantum Advertising contacted AfriClad, a division of First African Holdings, to clad a digital screen at the airport which was about 10m x 18m. But there were a couple of other interesting specifications to the project: the cladding needed to fit perfectly around the digital screen and it needed to be waterproof.

Southern Sun OR Tambo Airport

Southern Sun OR Tambo International

The Southern Sun Hotel at OR Tambo International Airport in Johannesburg needed a cladding specialist to revamp its exterior. The already existing fascia had become problematic due to its high maintenance costs, and so had to be replaced.

First African Holdings was contracted to design, manufacture and install new aluminum composite material (ACM) fascia for the hotel. The fascia was to cover 67m2 and would be manufactured out of Hulabond ACM to match the existing cladding on the rest of the building.

Pages

Quick Enquiry

Sign-up to our Newsletter